Logo Syarikat Peralatan Mekanikal Rongjing Zhengzhou

Pilih Bahasa

English 中文 Русский Bahasa Melayu العربية Bahasa Indonesia Tiếng Việt ไทย Deutsch Polski

Pusat Berita

Laman Utama / Artikel Teknikal / Zhengzhou Rongjing Machinery Equipment Co., Ltd.: Technical Practice in Full Range Hoisting Winch R&D and Customized Solutions

Zhengzhou Rongjing Machinery Equipment Co., Ltd.: Technical Practice in Full Range Hoisting Winch R&D and Customized Solutions

Masa Kemaskini: 2026-05-29
Jumlah Klik: 112

I. Technical Background and Industry Pain Points
卷扬机应用场景
The winch, as the core component of lifting equipment, needs to meet diverse requirements for pulling force, speed, installation space, and control accuracy under different working conditions. Traditional products often suffer from poor adaptability and high maintenance costs due to their single specification, insufficient structural rigidity, or weak customization capabilities. Zhengzhou Rongjing Machinery and Equipment Co., Ltd. has built a technical system covering a full range of models including electric control, planetary brake, vertical circulation, and external variable frequency, through comprehensive product research and modular design. This has resolved the challenges of lifting operations in various industry scenarios.

Part Two: Technical Architecture and Core Advantages
1. Full range of models covered
Our company's winches cover four core series: electric winches (rated pulling force 5-200 tons, speed 0.5-30m/min), planetary handbrake winches (braking torque up to 5000N·m, suitable for high-frequency start-stop scenarios), vertical circulating winches (compact structure, reducing installation space requirements by 40%), and external variable frequency winches (supporting stepless speed adjustment from 0-100Hz, energy consumption reduced by 25%). With over 50 types of models, they can flexibly match scenarios such as material hoisting in construction projects, ore lifting in mining, and gate opening and closing in hydraulic projects.
2. Customized service process
For customers' special working conditions, the company adopts a four-step closed-loop process of "requirement analysis-solution design-structure optimization-manufacturing production". For example, the external variable frequency winch customized for a shipyard project has achieved stable operation in a humid salt fog environment by adjusting the motor power (upgraded from 15kW to 22kW) and the reducer transmission ratio (changed from 1:30 to 1:40), shortening the braking distance to within 0.3 seconds, meeting the international ship classification society certification standards.
3. Material and Process Control
The main body of the product is made of high-strength Q345B structural steel, achieving hardness of HRC28-32 after heat treatment, with tensile strength increased by 30%. Key components such as gears and bearings are selected from imported brands like SKF and FAG, paired with CNC machining centers (accuracy ±0.02mm) and laser cutting technology to ensure interchangeability of parts. Before shipment, the entire machine must pass a 24-hour continuous load test (rated load 125%) and salt spray test (no corrosion for 480 hours) to ensure long-term reliability.

Chapter 3: Analysis of Typical Application Cases
1. Construction site scenario: high-rise material hoisting
A 30-story residential project utilizes the Rongjing Vertical Hoisting Winch (Model RJ-LS-10T). By optimizing the drum diameter (increased from φ800mm to φ1000mm) and the arrangement of steel wire ropes, the single lifting height is extended from 50 meters to 80 meters, reducing the number of equipment relocation times by 40%. Measured data shows that the equipment operates for 12 hours a day on average, with a failure rate below 0.5%, and maintenance costs are reduced by 18% compared to traditional models.
2. Mining operation scenario: Ore hoisting system
For the underground working environment at -300 meters in a certain iron mine, the company has customized a planetary winch brake (model RJ-XJ-50T) featuring a dual braking system (hydraulic disc brake + mechanical hand brake) and an explosion-proof motor (ExdIIBT4 rating). By increasing the area of the heat dissipation fin (from 0.5㎡ to 0.8㎡), the continuous working temperature is controlled within 65℃. After 18 months of project operation, the equipment integrity rate reached 99.2%, earning the customer's evaluation of "zero downtime".
3. Hydraulic Engineering Scenario: Gate Opening and Closing Control
In the renovation of a large reservoir gate, the external variable frequency winch (model RJ-BB-20T) achieves precise gate opening control (±1mm error) and synchronized operation of multiple equipment through an integrated PLC control system. With the torque limiter (set at 110% of rated load), overload risks are avoided, and compared to the original hydraulic system, energy consumption is reduced by 35%, resulting in annual electricity savings exceeding 120,000 yuan.

四、Technical Parameters and Compatibility Requirements

Model SeriesRated Tension (ton)Speed Range (m/min)Application Scenario
Electrical winch5-2000.5-30Construction and material hoisting
Planetary winch with handbrake2-500.3-15Mining exploitation, high-frequency start and stop
Vertical circulating winch3-300.8-20Space-limited scenarios
External variable frequency hoist1-200-100 (Continuous speed regulation)Hydroengineering, precision control

Equipment operating environment requirements: Temperature -20℃~+50℃, humidity ≤95%RH (no condensation), altitude ≤3000 meters. Special working conditions require advance communication and customized solutions.

五、常见问题解答
Q1: How long is the custom-made winch production cycle?
A: Standard model production cycle is 15-20 days, customized models require assessment based on technical complexity, usually 30-45 days. Complex projects (such as explosion-proof design) may take up to 60 days.
Q2: How to choose the suitable winch model?
A: Consider the tensile requirements (reserve 20% safety margin), lifting height (affects reel size), speed requirements (matched with work efficiency), and installation space (vertical/horizontal structure). The company offers free selection consultation.
Q3: What are the key points to note in equipment maintenance?
A: Daily check wire rope wear (replace when diameter reduces by 10%), brake clearance (0.5-1mm), lubricating oil level; conduct load test quarterly; replace reducer gear oil annually. The company provides maintenance training services.

Kualiti Utama, Perkhidmatan Terbaik
{{template_your trusted partner}}